Waste Management Plan, Wirral College

Wirral Waste managment plan.jpg

Waste Management Plan at Wirral College

B T O’Sullivan Construction Solutions were employed to implement a waste management plan for the removal of inert material off site as a managed material. This was then successfully incorporated into a separate project requiring material suitable for further engineering. This waste management plan was accepted by the client and successfully implemented by B T O’Sullivan Construction Solutions resulting in a significant cost and time saving for the client.

Due to our extensive knowledge in this area and previous success working alongside local Consulting Engineers, we advocated the reuse of inert material instead of it being sent to landfill. In this case, a local site with underlying peat, which required time to be engineered out.