Car Park Repair Works Successfully Completed in Manchester
Lighting Column Repair Works at Chorlton Car Park, Manchester
B T O’Sullivan Construction Solutions were contacted to carry out repair works on a damaged lighting column in the busy town centre of Chorlton, Manchester.
The car park that the works were being carried out is one of the busiest in the area therefore it was essential to achieve completion in the shortest time possible. There was very limited space on the site and it was imperative to follow full health and safety procedures ensuring best practice always.
Details of the job included, breaking out and excavating the existing tarmac area surrounding the damaged lighting column. Setting a 225mm diameter, 1200mm deep sleeve with concrete surround to accept the new lighting column. Making good to concrete finished levels followed by finally setting the new lighting column in place, lining, levelling and sand to fill. BTOCS successfully completed the job within 48 hours.